12th tee construction

Work is well under way on the construction of the new 12th tee.  The base has been raised, the irrigation pipes installed and we've started bringing in and levelling the topsoil.  The turf is due to be delivered in mid November and given reasonable growing weather in the spring the tee should be ready for play by early summer.

Levelling the subsoil base